Welding and construction of 250mm steel pipes from Kpong Water Works to Yogaga Hill Reservoir.
Fabrication of bends, tees and reducers. Installation of pipeline fittings and accessories ( Washouts, Air valves, Isolation valves etc.)
Interconnection and Tie-ins to existing pipelines in Atimpoku, Senchi, Somanya, Agomanya,Sra, Akuse, Afienya and Dawhenya.
Connection systems at Tema reservoir on the Yogaga Hills at Kpong Connection systems at Atimpoku reservoir.Pipe laying and connection systems at Akwale, Dodowa and Adukrom.